
Nigeria · Workshop
Beverage Factory, 7,600 m²
Production and warehousing hall for a Lagos beverage group, including 5 t process cranes and CIP rooms.
- Location
- Nigeria
- Completed
- 2025
- Area
- 7,600 m²
- Clear span
- 26 m
- Steel tonnage
- 560 t
A turnkey production building: 26 m span production bay, two-storey process office block, hygienic wall panels in wash-down areas, and 5 t cranes for bottle-line maintenance. Delivered with full EN-standard documentation for the client's European equipment vendor.
Erection completed in 71 days despite a challenging rainy season — our crews re-sequenced to steelwork-first, cladding-after methodology.


Get a quotation for your project
One message is enough. Our engineering team takes it from there.