
Saudi Arabia · Warehouse
Logistics Center Phase I, 9,000 m²
Heat-reflective roofing, 9 m clear height and 14 dock doors for a 3PL operator in Riyadh.
- Location
- Saudi Arabia
- Completed
- 2024
- Area
- 9,000 m²
- Clear span
- 30 m
- Steel tonnage
- 640 t
Designed for 50 °C summers: high-albedo roofing with a ventilated cavity, 100 mm PU wall panels and 9 m clear height for narrow-aisle racking. SAPMA-compliant fire exits and sprinkler interfaces were coordinated with the local authority.
Shipped via Jeddah Islamic Port, erected by our supervision team with a local crew of 18.


Get a quotation for your project
One message is enough. Our engineering team takes it from there.